INSTRUCTION MANUAL - EUROPEAN VERSION 135369 06.03.08 69
SC22-3 Safety Controller Maintenance
8 MAINTENANCE
8.1 PREVENTIVE MAINTENANCE
8.2 SYSTEM CHECKOUT
8.2.1 Schedule of Check-outs
Verifying the configuration and proper functioning of the Safety Con-
troller includes the verification of each Safety Input and Non-Safety
Input device, along with each Output Device. As the Inputs are indi-
vidually switched from the Run state to the Stop state, the Safety Out-
puts must be checked to verify that they turn ON and OFF as
expected. Other Inputs mapped to the same Safety Outputs as the
one that is being tested, must be in their ON-state during the test.
A comprehensive test must be used to verify the operation of the
Safety Controller and the functionality of the intended configuration.
The checklist in block 8.2.2 on page 69 is generic and is intended to
assist in developing a customized (configuration-specific) checklist
for each application. This customized checklist must be made avail-
able to maintenance personnel for commissioning and periodic
check-outs. A similar, simplified daily checkout checklist should be
made for the operator (or Designated Person as specified in block
1.8.1). It is highly recommended to have copies of the Wiring Dia-
grams and Ladder Logic Diagrams and the Configuration Summary
available to assist in the checkout procedures.
8.2.2 Commissioning Checkout
A Qualified Person as specified in block 1.8.2 on Page 4 must per-
form a safety system commissioning procedure before the safe-
guarded machine application is placed into service and after each
Safety Controller configuration is created or modified.
8.2.3 Periodic (6 Monthly) Checkout
A Qualified Person as specified in block 1.8.2 on Page 4 must also
perform a safety system re-commissioning 6 monthly or at periodic
intervals based on the appropriate local or national regulations.
8.2.4 Daily Operational Checks
A Designated Person as specified in block 1.8.1 must also check the
effectiveness of the protective devices as per the device manufactur-
ers’ recommendation each day that the safeguarded machine is in
service.
8.2.5 Commissioning Checkout Procedure
For the initial part of the commissioning checkout, the Control-
ler and associated safety systems must be checked without
power being available to the guarded machine. Final interface
connections to the guarded machine cannot take place until
these systems have been checked out.
8.2.5.1 Commissioning Pre-Checks
Verify pre-checks as follows:
1) Verify power has been removed from machine, and no power
is available to machine controls or actuators.
2) Referring to figure 25 on page 69, verify that 7-pin connector is
unplugged from SC22-3 Safety Controller to ensure that Safety
Outputs SO1 (A and B), SO2 (A and B) and SO3 (A and B) are
not connected to machine.
Permanent connections will be made at a later point in this
checkout.
8.2.5.2 Verifying System Operation
The commissioning checkout procedure must be performed by a
Qualified Person as specified in block 1.8.2 on Page 4 (see also
warning on page 69). It must be performed only after configuring the
Controller and after properly installing and configuring the safety sys-
tems and Safeguarding Devices connected to its Inputs (per Appen-
dix A and the appropriate standards).
The commissioning checkout procedure is performed on two occa-
sions:
• When the Controller is first installed to ensure proper installation
• Whenever any maintenance or modification is performed on the
System or on the machinery being guarded by the System, to
ensure continued proper Controller function (see
block 8.2.1 on
page 69
for a schedule of required check-outs)
PERIODIC CHECKOUTS
T
HE COMMISSIONING, PERIODIC AND DAILY SAFETY SYSTEM CHECKS MUST BE PER-
FORMED BY APPROPRIATE PERSONNEL AT THE APPROPRIATE TIMES (AS DE-
SCRIBED IN block 8.2.1 on page 69) IN ORDER TO ENSURE THAT THE SAFETY
SYSTEM IS OPERATING AS INTENDED. FAILURE TO PERFORM THESE CHECKS MAY
CREATE A POTENTIALLY DANGEROUS SITUATION WHICH COULD LEAD TO SERIOUS
INJURY OR DEATH.
DO NOT USE MACHINE UNTIL SYSTEM IS WORKING PROPERLY
I
F ALL OF THESE CHECKS CANNOT BE VERIFIED, DO NOT ATTEMPT TO USE THE
SAFETY SYSTEM THAT INCLUDES THE SC22-3 SAFETY CONTROLLER AND THE
GUARDED MACHINE UNTIL THE DEFECT OR PROBLEM HAS BEEN CORRECTED (SEE
chapter 8). A
TTEMPTS TO USE THE GUARDED MACHINE UNDER SUCH CONDITIONS
COULD RESULT IN SERIOUS BODILY INJURY OR DEATH.
BEFORE APPLYING POWER TO THE MACHINE
V
ERIFY THAT THE GUARDED AREA IS CLEAR OF PERSONNEL AND UNWANTED MA-
TERIALS (SUCH AS TOOLS) BEFORE APPLYING POWER TO THE GUARDED MACHINE.
F
AILURE TO DO SO COULD RESULT IN SERIOUS BODILY INJURY OR DEATH.
WARNING
!
SC22-3
Safety Controller
Power
Status
Tx/Rx
SO1
SO2
SO3
Figure 25 Safety Output Terminal Block